Further Progress

The crew framing our new winter home finished their part of the job yesterday. We walked around the skeletal building this morning checking out the feel of the floor plan which we concluded we liked quite as much as when we had visited the model. See photos at CruzTalking Two.

The next step is roof trusses, which have yet to arrive. These are delivered pre-made to the site, and then “flown in” via crane and tied to the framing by a specialist crew who do just that. We hope to be able to watch some of that process. 

The DrsC have had four houses built for us, and it is a great show. We have lived in an RV for at least some of the process in each case, some of it onsite and some nearby, depending on what local zoning permitted. This time we are not onsite but maybe 3 miles away in a nice RV park. It is an adventure this time, just as it was when we did it in ‘87, ‘93, and ‘00.